Who should sign a purchase order, and at what amount?

3 min read

If head office signs everything the site stops. If nobody does, finance finds out late. How approval by amount sends each order to the right level.

Picture two versions of the same company. In the first, every order goes to the general manager: cement waits on a signature while the pour date slips, and the day at the top disappears into small tickets. In the second, whoever runs the site signs what the site needs, and finance learns about a large commitment when the invoice arrives. Most companies live somewhere between the two, with a rule nobody quite remembers and exceptions everybody does.

Authority should follow the size of the commitment

Small purchases are best decided close to the work, by someone who knows the need. Large ones carry a risk the site cannot judge alone, because they touch the company’s cash and its other projects. So the useful question is how high each order must climb. FlexiStrux works with four levels by default:

  • Project manager: day-to-day site supply, which should not be slowed down by head office
  • Operations manager: mid-size commitments, which get an operational second opinion
  • Finance manager: significant cash exposure, which reaches finance before it is committed
  • General management: strategic spend, as a leadership decision on the record

Where you draw the lines between them is your call. Thresholds are set for each company during deployment, and they depend on things only you can weigh, such as the size of your usual orders and who is actually reachable when a site needs an answer.

A signature needs a file behind it

A signature on a bare order is a rubber stamp. The person at the top of the ladder needs to see what is being committed, and why.

A FlexiStrux purchase order is created from the winning offer, so it arrives with its context: the project, the cost centre, the originating request, the winning quotation, the approved supplier and amount, the delivery warehouse, the payment terms and the expected delivery date. It links back to the supplier evaluation and the procurement request. By then, a named superior has approved the need, the offers have been scored, and the award has passed a technical and a financial review. Whoever signs is reading a file, and can open any part of it.

The access profiles keep preparation and approval apart. A procurement user prepares the purchasing documents without approving them, and a procurement manager owns the calls for quotes, supplier quotations and purchase orders.

How the approval travels

Purchase order approval is one of the 5 approval circuits that ship with the platform, drawn as a diagram you can read on screen. How far an order travels depends on its amount. Each person has a list in the process console showing what is waiting for them, and the pending approvals report shows every document waiting on a decision, who it is waiting for and how long it has been waiting. A stalled order has a name next to it.

Every approval is logged with the user, their role, the time and the stages the document moved between.

The thresholds will change, and that is expected

A company grows, a new finance director arrives, a large project changes what counts as a large order. The circuits are versioned and can be edited and redeployed from inside the platform. Changing who approves what is a configuration session, not a development project, so a threshold set during deployment does not have to last for good.