How to follow several sites without eight spreadsheets

3 min read

Eight sites, eight spreadsheets, each a week old. Why site reports never line up, and what a live portfolio view shows a director in their place.

The director asks how the sites are doing. Over the following days, eight spreadsheets arrive from eight site offices, each a week out of date and each built differently. One counts what has been committed, another only what has been invoiced, and a third has a tab nobody else understands. Someone at head office stitches them together, and the summary that reaches the general manager describes last week.

Why the spreadsheets never line up

Nobody builds these files badly on purpose. Each site manager tracks what they need in the way that makes sense to them, usually at the end of a long day. But a spreadsheet only holds what someone remembered to type, and it gets compiled after the events it describes. A purchase made by phone is missing from it until the invoice turns up.

A standard template fixes the layout and leaves the delay where it was. The numbers still arrive late, by hand, from people whose main job is running a site.

The report should come out of the work itself

A portfolio view stays current only if its figures come from the operations themselves: the request approved, the charge booked, the work validated. Nobody should have to write a status report for the numbers to exist.

That is also why the view depends on the rest of the chain. An unauthorised purchase makes a project’s cost unknowable, and an unknown cost makes the budget fiction. If purchases and costs live outside the system, no dashboard can show them, however good it looks.

What the director sees in FlexiStrux

FlexiStrux gives one live view across every project: budget consumed, approvals waiting, risks, delays. Each project carries its type, location, status and a risk level from low to critical, along with its approved budget and a remaining budget recalculated from approved charges.

The construction workspace has 12 live indicators and 8 breakdown charts, covering such things as active projects, site needs awaiting a superior, work awaiting validation and total approved charges in dirhams. There are 10 built-in reports, and three of them do most of the work at portfolio level:

  • Project portfolio: type, location, status, approved budget, charges, remaining and percentage spent, across every project
  • Project budget vs actual: total budget, spent and remaining, and which projects are past 90% spent
  • Pending approvals: every document waiting on a decision, who it is waiting for and how long it has been waiting

Nobody has to open a report to catch the budget problem, either. A daily check alerts the person responsible once a project passes 90% of its approved budget.

Each role gets its own screen

A construction director and a warehouse manager need different things, so the dashboards are built by role. A project manager sees open site needs, delayed tasks and work waiting validation. Procurement sees calls for quotes in progress and late supplier deliveries. The warehouse sees stock by project and site warehouse balances. Finance sees budget against actual and pending supplier invoices. The construction director sees the whole portfolio, critical risks and the high-level approvals waiting on them. They all read from one database, so when two of them talk about a project, they are looking at the same figures.

A spreadsheet is not always the wrong tool. A company with a single site and few people involved in purchasing can do well with a carefully kept one. The trouble starts when several sites run at once and the file has to answer for all of them.