No purchase, no delivery, no cost without a signature.

FlexiStrux is the ERP for construction and BTP companies: the FlexiERP core, plus everything your sites need. Every decision passes a named approval and leaves proof attached to its project.

A foreman in a hard hat and hi-vis vest beside a pallet of cement bags.
Site requestCHT-24-031
Item
Cement, 40 bags
For
Level 2 slab
Requested by
Foreman
Sent to
Works manager

Sent to superior

Illustration

One ERP. It runs the company and the sites.

FlexiStrux brings two things together: the FlexiERP core, which runs the company, and the features the construction site needs. One platform, one database, one login.

What the site needs

  • Site needs and approval
  • Supplier offer comparison
  • Orders signed by amount
  • Goods receipt and site warehouses
  • Issues to site
  • Work execution and proof
  • Fleet and equipment by project
  • Project charges and budget
  • A trace of every step

The FlexiERP core

  • Finance and accounting in dirhams
  • Purchasing
  • Stock and warehouses
  • Suppliers and customers
  • Assets and vehicles
  • People
  • Projects and tasks
  • Governance

The cement a foreman asked for on Monday is the same line your accountant reconciles at the end of the month.

Already have an ERP? FlexiStrux can replace it, or run your construction operations while your current system keeps group accounting.

Each problem hides the next.

Five scenes every works director knows. They come as a chain: you do not fix them one at a time.

01

Purchases nobody authorised

A foreman orders by phone. The invoice arrives weeks later, and nobody can say who agreed, at what price, against which budget.

With FlexiStruxA request cannot become a purchase without a named superior approving it, on the record.

02

Costs that float free of projects

Fuel, rentals, subcontractors and small expenses land in general accounts. At closing nobody knows what the project cost, so the next tender is priced on a guess.

With FlexiStruxNo charge, purchase, stock movement or site work can exist without a project attached.

03

Supplier choices that cannot be defended

The award goes to the usual supplier. When an auditor, a lender or a new director asks why, there is only a memory.

With FlexiStruxA scored comparison on technical quality, price and lead time, with the recommendation and its reasoning kept for good.

04

Work declared finished, with no proof

An installation is “done”. Three months later a defect appears, with no record of what was delivered, who executed it or who accepted it.

With FlexiStruxWork cannot close without photographs, nor without validation by someone other than the person who did it.

05

Eight sites, eight spreadsheets

The director asks how the sites are doing and receives eight spreadsheets, each a week out of date and built differently.

With FlexiStruxOne live portfolio view: budget consumed, approvals waiting, risks and delays.

01 / 05

An unauthorised purchase makes the project cost unknowable. An unknown cost makes the budget fiction. A fictional budget makes the portfolio view useless. And without proof of execution, every dispute is settled from memory. FlexiStrux deals with the whole chain.

A bag of cement, from request to photograph.

Thirteen controlled steps. Follow one bag, from the need raised on site to the cost booked to the project.

  1. 01

    Need identified

    The site raises a request against its project: what, how much, by when, why, at what estimated cost.

  2. 02

    Sent to a superior

    The request goes to a named superior, notified at once. The requester can no longer change it.

  3. The moment that matters
    03

    The superior decides

    Approve, reject or ask for more, seeing the project, the remaining budget, the justification and the attachments.

    The approval you never had

  4. 04

    Procurement request

    One click turns the approved need into an official request. The two stay linked.

  5. 05

    Offers collected

    A call for quotes goes to suppliers.

  6. 06

    Offers scored

    Technical quality, price, lead time: offers are ranked and the recommended supplier is flagged.

  7. The moment that matters
    07

    Best offer approved

    A technical review, then a financial review.

    The award you can justify

  8. 08

    Order issued

    Signed according to the amount, from project manager up to general management.

  9. 09

    Goods received

    Quantities checked against the order, with a quality inspection when needed.

  10. 10

    Stock booked

    The cement goes into the project or site warehouse, not one company pile.

  11. 11

    Issued to site

    Who asked, who approved, who issued, who received: all of it is recorded.

  12. The moment that matters
    12

    Work executed

    Planned against actual dates, evidence attached, validated by someone else.

    The work you can prove

  13. 13

    Traced and costed

    Every stage change leaves a permanent trace, and every approved charge updates the remaining budget.

Try to break a rule.

Nine rules the platform enforces itself. They are not policies your teams have to remember: it refuses.

Pick a shortcut

  • Approve my own request

    Rule 1No self-approval

    A request is approved by a named superior, never by the person who raised it. Overrides are limited to administrators and the construction director, and they are recorded.

  • Name myself as my superior

    Rule 2No self-appointed approver

    A requester cannot name themselves as their own superior.

  • Reject without a reason

    Rule 3No silent rejection

    A rejection cannot be saved without a written reason.

  • Order without approval

    Rule 4No procurement without approval

    No procurement request exists without the approved need before it.

  • Award without comparing

    Rule 5No award without comparison

    An award goes through the comparison of offers. An emergency needs an explicit permission, and it is recorded.

  • Accept my own work

    Rule 6No self-accepted work

    Work is validated by someone other than the person who executed it.

  • Close with no photo

    Rule 7No closure without proof

    No evidence, no validation: before and after photos, a technical report, a delivery note, a certificate or a signed acceptance.

  • Book a cost to no project

    Rule 8Nothing happens off-project

    No charge, purchase or stock movement exists without a project attached.

  • Erase a step

    Rule 9Nothing changes unrecorded

    Every change is recorded: the person, their role, the exact time, and the stages the record moved between.

You are not buying a promise that your team will follow a process. You are buying a platform that will not let them skip it.

A supplier choice you can defend.

Every offer is scored on the same three criteria. Lead time is scored against the slowest offer on the table. The recommendation and its reasoning stay attached to the file.

A technical review, then a financial review. One click creates the order from the winning offer.

OfferTechnical40%Price40%Lead time20%Score
Offer ARecommended
Offer B
Offer C
Illustration

The bigger the order, the higher the signature.

  1. Project manager
  2. Operations manager
  3. Finance manager
  4. General management

Thresholds are set for each company.

Eight sites, one board.

No more eight spreadsheets. The director sees every project live: budget consumed, approvals waiting, risks, delays.

  • HousingCasablanca

    Risk: Low

    Budget consumed

    Approvals waiting

  • RoadworksRabat

    Risk: Medium

    Budget consumed

    Approvals waiting

  • WarehouseTangier

    Risk: Low

    Budget consumed

    Approvals waiting

  • OfficesCasablanca

    Risk: High

    Budget consumed

    Approvals waiting

    Past 90% of the approved budget: the person responsible is alerted.

  • SchoolKenitra

    Risk: Low

    Budget consumed

    Approvals waiting

  • Water networkMarrakesh

    Risk: Medium

    Budget consumed

    Approvals waiting

  • Apartment blockAgadir

    Risk: Low

    Budget consumed

    Approvals waiting

  • BridgeFez

    Risk: Critical

    Budget consumed

    Approvals waiting

Illustration

  • Past 90% of the approved budget, the project’s responsible is alerted, before the overrun, not at closing.
  • Equipment assignments nearing their end are flagged a week ahead.
  • 12 live indicators, 8 breakdown charts, 10 built-in reports.
  • A dashboard for each role: project manager, procurement, warehouse, finance, construction director, auditor.

Built for Morocco. And it stays yours.

The questions of every first meeting: where does our data live, who owns it, and is it made for our sites.

FlexiStruxThe site board
Currency
The dirham, natively. Moroccan accounting is covered by the FlexiERP core.
Languages
French, English and Arabic, right to left.
Sites
Multi-site by design: stock and costs kept apart for each site, from Casablanca to Tangier.
Hosting
Your choice: your own servers, sovereign Moroccan hosting, or a cloud you select.
Data
It stays in your database. No proprietary lock-in, and code escrow for your instance in the licence.
Access
15 access profiles, from site manager to construction director, including a read-only auditor.
On site
In a browser, on a tablet: requests and photos from the site. The mobile app is on our roadmap.
A tablet in a works manager’s hand, on site.

We start with one site.

A pilot on one of your real sites, then we extend. The quote follows three steps, always the same.

A permanent licence for the company, all business modules included, no per-user subscription on top.

  1. 1

    A scoping call

    Thirty minutes, remote or on site: how many sites, how many users, your current process, your constraints. No commitment and no price quoted in the room.

  2. 2

    An itemised proposal

    Line by line: licence, deployment, bespoke modules, training, maintenance. Nothing hidden, nothing bundled to disguise a number.

  3. 3

    Delivery against a dated plan

    A dedicated team, dated deliverables, support after go-live. You keep control of scope and pace.

What directors ask

What is FlexiStrux?

The ERP for construction and BTP companies: the FlexiERP core, which runs finance, purchasing, stock, suppliers, assets and people, plus the features the construction site needs. One platform, one database, one login.

Who makes FlexiStrux?

FlexiGlob. FlexiStrux is a product of FlexiGlob, which designs it, deploys it and trains your teams.

We already have an ERP. Do we have to replace it?

Not on day one. FlexiStrux is a full ERP and can take over everything, but that is your decision and your timetable. The urgent part is what your current system never sees: the request, the approval, the award, the delivery, the execution and the proof on site.

Our data has to stay in Morocco.

Then it will. You choose where the platform runs: your own servers, sovereign Moroccan hosting, or a cloud you select.

What happens to us if FlexiGlob disappears?

Your data stays in your database and your configuration in your instance. The platform keeps running, and any competent integrator can take it over. Code escrow for your instance is part of the licence.

Can we change the approval circuits later?

Yes. The circuits are drawn as diagrams inside the platform, versioned and redeployed from the same screen. Changing who approves what is a configuration session, not a development project.

Is there a mobile app for site managers?

Not yet: it is on our roadmap. Today FlexiStrux works in a browser on a site tablet, to raise requests and attach photos.

How much does FlexiStrux cost?

There is no public price list. The model: a permanent licence for the company, all business modules included, no per-user subscription on top. A tailored quote follows a thirty-minute scoping call.

Do you have references in Moroccan construction?

We are building our reference base now. That is why we offer to start with a pilot on one of your sites, rather than a list.

Let’s talk about your sites.

Thirty minutes to understand your sites, your purchasing and your approvals. Then an itemised proposal.

A product ofFlexiGlob